Geelong Distribution Centre
850t structural package — portal frames, cranes beams and mezzanines for a 20,000m² distribution facility.
Full structural steel package for a 20,000m² distribution centre: detailing, fabrication and erection of portal frames, crane beams and two mezzanine levels.
This is sample content — replace with the real project write-up in the admin portal.
Site photos